•  
  •  
 

Journal of Tashkent Institute of Railway Engineers

Abstract

As you know, an increase in the volume of production of any object requires to reasonably provide for a comprehensive analysis of the compliance of its technical equipment and technology of work with the prospective traffic volumes. The article analyzes the existing and prospective volumes of work, shows the results of calculations, the available throughput capacity of the station. "B" - Art. "З" and the throughput of the receiving and departure tracks stations "Z", "P" and “S ", the required number of shunting locomotives has been determined, a number of measures have been proposed to improve the work of the access track of JSC “UMС”.

First Page

71

Last Page

77

References

1. Technological process of interaction between station “B” of JSC “UTY” and JSC “UMK”. T., 2019.

2. Kozachenko D.N., Vernigora R.V., Berezovy N.I. Comprehensive analysis of the railway infrastructure of a metallurgical plant based on graphic-analytical modeling / Transport systems and transportation technologies, 2012. – P. 55-60.

3. Kozachenko D.M. Program complex for simulation modeling of railway stations on the basis of daily schedule-schedule / D.M. Kozachenko, R.V. Vernigora, R.G. Korobyova // Za-lizn. transp Of Ukraine. – 2008. – №4. – P. 18-20.

4. Adilova N.D. Optimization of internal transportation of a metallurgical plant (on the example of JSC "ArcelorMittal Temirtau"): thesis ... Doctor of Philosophy (PhD). – Almaty: KazATK, 2018 . – 140 p.

5. Rasulov M.X. Organization of rail transportation: theory and practice: monograph. - Tashkent: “Ilm-ziyo-zakovat”, 2019. – 400 p.

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.