•  
  •  
 

Journal of Tashkent Institute of Railway Engineers

Abstract

The main problem of single track railway lines is that the existing capacity does not satisfy the need, resulting in the need to apply a number of measures. This is exactly the problem that exists in the considered junction T-A, which in the future will be a link in the “China-Kyrgyzstan-Uzbekistan” transport corridor. The article provides possible solutions to this problem. The adoption of the optimal solution in the future will solve not only the problem of through put, but also help to improve the qualitative and quantitative indicators of this site.

First Page

184

Last Page

187

References

1. https:// podrobno.uz/ cat/ economic/ kitay – Kyrgyzstan – i –Uzbekistan – obsudyat – stroitelstvo – zheleznoy - dorogi/.

2. http://news.mail.ru/inworld/uzbekistan/economics/11181626/?frommail=1 , 04.12.2012

3. http://kommersant.uz/avtokoridor-uzbekistan-kyrgyzstan-kitaj-sokratil-srok-dostavki-gruzov-v-4-raza/.

4. Abramov A.A. Upravlenie jekspluatacionnoj rabotoj: Ch. II. Grafik dvizhenija poezdov i propusknaja sposobnost':Ucheb. pos. −M.: RGOTUPS, 2002. −171 s.

5. Svetashev A.A., Bashirova A.M., Ahmedova M.D. Sostavlenie grafika dvizhenija poezdov: Metodicheskoe posobie. Tashkent.-2019.-60 s.

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.