•  
  •  
 

Journal of Tashkent Institute of Railway Engineers

Abstract

In this article to connect the wagons loaded to the trains shortening the staying time in process of their collection and recycling delivers freight wagons accelerates the selection and use of shunting equipment, sends wagons to the station at the right time. Is listed below in railway transport on delivery freight wagons, international and local wagons staying time the main quality indicators in station. As well as developed scheme of the algorithm for the timing of staying in the wagons at the station.

First Page

160

Last Page

166

References

1. “Temir jyl transporti tўgrisida”gi O'zbekiston Respublikasi qonuni. 1999-14 p.

2. Ustav zheleznoj dorogi Respubliki Uzbekistan. T.: 2008. –111 s.

3. Pravila perevozki gruzov zheleznodorozhnym transportom. Moskva, 2003. - 712 s.

4. Instrukcii k Soglasheniju o mezhdunarodnom gruzovom soobshhenii (SMGS). 1992 g.-190 s.

5. Butunov D. B. Ocenka neproizvoditel'nyh poter' v rabote sortirovochnoj stancii / D. B. Butunov, A. G. Kotenko // Izvestija PGUPS. – 2018. – № 4. – S. 498-512.

6. Smetatnin A.I. Tehnicheskoe normirovanie jekspluatacionnoj raboty zheleznyh dorog. Moskva. «Transport» 1984 g. – 292 c.

7. Nurmuhamedov R.Z. Upravlenie jekspluatacionnoj rabotoj zheleznyh dorog. Uchebnoe posobie / R.Z. Nurmuhamedov // – T.: Ukituvchi, 1990. – 416 s.

8. Qobulov Zh.R., Barotov Zh.S. Temir jўl transportida vagonlardan samarali fojdalanish usullari / Qobulov Zh.R., Barotov Zh.S. // TAJI ahborotnomasi. 2019.-№1. 92-97.

Share

COinS